Expertise
Reference list
TotalFinaElf Canyon Express Development
The Canyon Express Development, concerned the development of three fields (King’s Peak, Aconcagua, Camden Hill) situated in the Gulf of Mexico.
In relation to this deep water project, with waterdepths varying from ~300 feet to ~7,200 feet, rockdump protection operations were carried out at various crossing locations of the 2 no’s 12” Pipelines and Umbilical routes.
The D.P. Fall Pipe Vessel “Rollingstone”, with a loading capacity of approx. 11,500 tons, was used to execute above mentioned rockdumping works.


