Zeepipe Development Project
The works for the 40” Zeepipe Gas Pipeline involved dredging and marine operations both offshore and on the landfall at Zeebrugge, Belgium. Extensive dredging works were carried out in the shallow surf zones by cutter dredgers. In the Scheur shipping channel and Wielingen coastal fairway, dredging operations were carried out by assistance of hopper dredgers. At the Belgium and Dutch continental shelf pre-sweeping i.e. removal of sand dunes were performed prior pipelay.
For this major contract, the following activities were successfully completed:
- Artificial island construction
- Cofferdam
- Shipping channel crossings
- Breakwater construction
- Shore approach / trench dredging
- Sand / rock backfill
- Pipe pull operations
- Pre-sweeping works
- Lay barge access dredging