Expertise
Reference list
BCOT (Bintulu) and MCOT (Miri) Shore approaches
The scope of work for the two 18” Pipelines at MLNG (Bintulu) and one 16” at MCOT (Miri) in Malaysia, included the following activities:
- Trench Dredging
- Sheet piling
- Beach pull / pipelay
- Maintenance of trench
- Trench backfill
- Reinstatement of Site
Main trench dredging and backfilling works were carried out by Cutter Suction Dredger “Vlaanderen XIX”


