Minervum 7442
4817 ZG Breda
The Netherlands
T +31 76 5204140
F +31 76 5204150
info@tideway-deme.nl

Member of the DEME Group

Expertise

Reference list

BCOT (Bintulu) and MCOT (Miri) Shore approaches

The scope of work for the two 18” Pipelines at MLNG (Bintulu) and one 16” at MCOT (Miri) in Malaysia, included the following activities:

  • Trench Dredging
  • Sheet piling
  • Beach pull / pipelay
  • Maintenance of trench
  • Trench backfill
  • Reinstatement of Site

Main trench dredging and backfilling works were carried out by Cutter Suction Dredger “Vlaanderen XIX

line