Minervum 7442
4817 ZG Breda
The Netherlands
T +31 76 5204140
F +31 76 5204150
info@tideway-deme.nl

Expertise

Reference list

Maersk / Halfdan NE Development

The Maersk Halfdan NE Development Project and the 26” Gas Pipeline for the Tyra WE to B11 to F3 Development, are located in Block 5505/13 Danish Sector, Block B11 of the German Sector and Block F3 of the Dutch Sector of the North Sea.

The projects include installation of four pipelines:

  • 24" Halfdan BA to Halfdan C wet gas export pipeline
  • 24" Halfdan BA to Tyra WE wet gas export pipeline
  • 2.5" Halfdan BA to Halfdan C flexible pipeline
  • 26" Tyra WE to Nogat F3 Interconnector Pipeline via B11 Wye Station.

Rock placement was required at 6 crossing locations (Phase I) and on several subsea structures and piplelines near Platform installations (Phase II & III).

line