Minervum 7442
4817 ZG Breda
The Netherlands
T +31 76 5204140
F +31 76 5204150
info@tideway-deme.nl

Expertise

Reference list

Greenstream Project - Libya Landfall

The Greenstream Project concerned the building of a new Gas Transportation System (LGTS) to transport the dry and sweet natural gas from Mellitah Gas Treatment Plant’s Launching Terminal (Libya) to Sicily Receiving Terminal (Italy) through a 32” offshore pipeline system across the Mediterranean sea.

The offshore section of the pipeline will be 516 km long and will be laid in a maximum waterdepth of 1,120 m.

Tideway’s scope of work in JV, included onshore preparation works and offshore trenching and backfilling works in relation to the landfall construction works.
Part of the works to be executed for the Libya Landfall are:

  • Onshore preparatory works
  • Causeway construction & onshore trench excavation
  • Offshore trench dredging
  • Assistance during pull-in operations
  • Onshore & offshore backfilling & rock dumping operations
  • Site reinstatement
line