Clyde Petroleum / Q8 Platform
Tideway’s scope of work for this project was the installation of rock dumping (60 - 80 mm) around the legs of the Wintershall / Q8 Platform for scour protection services around the platform base. Dumping operations and post-survey operations were carried out by Contractor’s D.P. Side Stone Dumping Vessel “Pompeď”. A Free Flying ROV was installed on board the vessel for the post survey works.