Minervum 7442
4817 ZG Breda
The Netherlands
T +31 76 5204140
F +31 76 5204150
info@tideway-deme.nl

Expertise

Reference list

NCMA Project Trinidad

The NCMA Development Project, located in the Caribbean Sea and Bay of Paria, required the installation of a 24” Gas Export Pipeline, which makes a landfall in Point Fortin, Trinidad. The landfall installation method was executed by means of a pipeline pull-in operation, whereby the lay vessel was stationed near shore and pipe was pulled of the vessel towards the shore.

Our scope of work included:

  • Landfall construction
  • Directional drilling works
  • Pipe pulling
  • Backfill Operations
  • Onshore pipelay
  • Reinstatement of coast line
line