Minervum 7442
4817 ZG Breda
The Netherlands
T +31 76 5204140
F +31 76 5204150
info@tideway-deme.nl

Member of the DEME Group

Expertise

Reference list

BP / Magnus EOR Project

The BP / Magnus Enhanched Oil Recovery (EOR) Project, comprising the construction of a system to transport dry natural gas by two 20” Trunklines from the Foinhaven and Schiehallion Fields West of Scotland to the BP Magnus Platform via the Sullom Voe Terminal (SVT) located on the Shetland Islands.

In relation to the project, Tideway provided various pre- and post-lay rock placement services for the protection and stability of two trunk lines and two flow lines.

The following rockdumping works were executed in relation to the project, divided over different execution phases:

  • Construction of pre-lay sleepers
  • Pipeline crossings
  • Protection berms
  • Wet storage berms
  • Stabilization berms
  • PLEM approaches
  • Free span rectification
  • Tee protection
line